Page 48 - Binder3
P. 48

2.  Automatic Sprinkler Installation
                                It is a condition precedent to our liability in respect of Damage that for any automatic sprinkler
                                installation in your custody or control you will:

                                a)  take all reasonable steps to prevent frost and other damage to the installation and if it is your
                                   responsibility maintain:
                                   i)  the installation including any automatic external alarm signal in efficient working order; and

                                   ii)  ready access to the water supply control facilities; and
                                b)  in the event that change, repair or alteration to the installation is proposed notify us in writing and
                                   obtain our written consent; and
                                c)  notify us immediately of any disconnection or failure likely to leave any area unprotected for
                                   12 hours or more; and
                                d)  allow us access to the premises at all reasonable times for the purposes of inspecting the
                                   installation; and
                                e)  carry out a test:
                                   i)  every week for the purpose of ascertaining:

                                      1)  the condition of any automatic external alarm signal and the relevant batteries; and
                                      2)  that the water motor alarm is in working order and that the stop valves controlling the
                                         individual water supplies and the installation are fully open the results of such tests to be
                                         recorded; and
                                      3)  that any pump can be started both automatically and manually and that in respect of any
                                         diesel engine driven pump the battery electrolyte level and density are correct with the
                                         completion of these tests being recorded; and

                                   ii)  quarterly or half-yearly if we require it for the purposes of ascertaining that each water supply
                                      is in order with the particulars of each test being recorded; and

                                f)  remedy promptly any defect revealed by such tests or otherwise. In the event that repairs or
                                   alterations become necessary to the installation we may at our option suspend cover against
                                   accidental escape of water from the installation if insured until the alteration or repairs have been
                                   carried out and approved by us in writing; and
                                g)  have a contract with installing engineers approved by us providing for the maintenance and half-
                                   yearly inspection of the installation and to obtain following each inspection certification that it is in
                                   satisfactory working order.

                                3.  Firebreak Doors and Shutters
                                You will maintain any firebreak doors and shutters in your custody or control in efficient working order
                                and such doors and shutters will be kept closed except during working hours.















      22
   43   44   45   46   47   48   49   50   51   52   53