5. Inadequate Maintenance
Damage to any item of Plant caused by or arising from non-compliance by you with the maintenance
requirements specified by the Plant manufacturer or supplier
6. Installation
Damage to any item of Plant during its installation, erection or dismantling
7. Known Defects
Damage caused by any faults or defects known to you which existed at the time of commencement
of this part whether or not such faults or defects were known to us
8. Modifications
Damage to any item of Plant caused by or arising from modifications to that item beyond the
specifications laid down by its manufacturer
9. Multiple Lifts
Damage arising out of any raising or lowering operations in which a single load is shared between any
item of Lifting and Handling Plant and any other equipment unless such operation is carried out in
accordance with the British or European Code of Practice for the Safe Use of Cranes applying at the
time of loss
10 Newly Installed Plant
Damage to any item of Plant due to its own Breakdown, Explosion or Collapse:
a) where it has not successfully completed its performance acceptance tests
b) occurring within 28 days of its initial installation at the Site
11. Product Recall
Damage to any item of Plant caused by or arising from non-compliance by you with a recall notice
issued by the Plant manufacturer or supplier
12. Supplier’s Responsibility
Damage for which a manufacturer, supplier, contractor or repairer is responsible to the extent that you
are able to recover from such party either by law or under contract
13. Terrorism
loss, damage, consequential loss, cost or expense directly or indirectly caused by, contributed to by,
resulting from or arising out of or in connection with terrorism.
In any action or suit or other proceedings where we allege that by reason of this exclusion cover is not
provided under this part the burden of proving that cover is provided under this part will be upon you
14. Testing or Repair
Damage to any item of Plant:
a) which at the time of its occurrence is undergoing a hydraulic test or any form of testing involving
abnormal stresses or intentional overloading
b) caused by the application of any tool or process in the course of its maintenance, inspection, repair,
alteration, modification or overhaul